Friday, July 6, 2012

Long day putting in the floor




I'm using n12 simply because it is cheaper than mesh.


I used timber blocks to support the square frame and keep it level. By the time I had to take them away to fill the floor, the concrete had harden up enough to safely remove them. I concreted in the sump pit a couple of days ago and covered the lid in plastic. It is important to have the lid there just so the concrete does not push in the sides making the lid not fit.


It started to rain yesterday, so I put up a canopy - just in case. The bent over rebar will be the ceiling.


The finished result, steel towel finish.

I used my ninja skills to jump out after finishing the toweling ;)

Wednesday, July 4, 2012

Retaining Wall for Fire Pit.


Retaining wall for the fire pit.

Monday, July 2, 2012

Washing, Foundations and Underpinning


Walls washed. The hole in the middle is for the sump.