I've estimated the weight of the bricks to be around 60 tons. This equates to 60 trips to the tip or 15 days or around 2 weeks. I've done 5 trips and it looks like I have already removed around 10% of the bricks. Is it worth doing it myself? It would definitely be cheaper.
There are about 49 bricks per square metre. Around 250 bricks per ton.
Of course I have the sandstone foundation blocks, the thin concrete slab, path and driveway and the floor boards.
The floor boards are a no brainer - lots of quality joists and bearers to salvage. I could re-use or sell the sand stone blocks. Time should not be an issue, suprisingly my de-construction work is not the critical path.
Tuesday, February 3, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment