All of the posts are in. We hired a crane ($500) to drop them all in. The carpenter thought they weighed around 200kg each. Of course I know this not to be true since that would mean I could lift 100kg - yeah right. The raw posts were 158mm square and 6.1m long. Their density would have to be 1.22 to be that weight. I forgot my camera, so sorry, not pictures. They all went in well and matched up so that they are vertical.
I took the plunge and asked for quotes through Trade Connect. After posting the job, 3 electricans were around that morning ready to quote me. Another couple are coming around Saturday. I recommend it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment