The tiler has finished tiling the upstairs with the downstairs to go. He is doing a good job.
There is no floor drain here because it is a summer kitchen. Tiles just look nice.
I put in a balustrade to block off the stairwell. I won't have time to do the stairs, so this will do in the meantime. It is very solid. Certainly Louka proof.
I spent some more time doing the storm water. It is very fiddly. I'm putting a first flush devices on each down pipe.
I missed my target of being finished by christmas. I'm very close.
Wednesday, December 23, 2009