Friday, May 27, 2011

Drive Way 3

I've just formed up the first track of the second drive way. This one will be 800m wide rather than 600mm. This should make it easier to park.



I used packers sometimes to make sure the timber position is just right.

I had to make a bridge so I can actually get the concrete where it needs to be.

Instead of encounter heaps of tree roots (I just had a few), I had to remove a thin layer of concrete that was left over from the building.

No comments: