It was pretty hard to take a picture of the excavation, so I took a video...
http://youtu.be/31Q05UoX1TE
Monday, May 21, 2012
Sunday, April 15, 2012
Cubby House
My next big project is a cubby house / firepit.
The cubby house is to be partially underground. and the fire put is to be sunken (around 450-500mm). The top of the cubby house will be around 0.9-1m and be a viewing platform/stage for Louka. The bottom bit will be the actual cubby house.
The first step is to remove the builder's toilet - done.
Second is to build what is called a diaphragm wall by the fence. I excavated a trench 100mm x 1400mm below the fence and filled it full of concrete and reo N12 @ 350mm . Being mostly sand, it was easy for the first metre. Then it was hard sandy clay. The idea behind a diaphragm wall is to enable "bulk excavation" without impacting the park. This wall is approximately half the final width of the wall.
The cubby house is to be partially underground. and the fire put is to be sunken (around 450-500mm). The top of the cubby house will be around 0.9-1m and be a viewing platform/stage for Louka. The bottom bit will be the actual cubby house.
The first step is to remove the builder's toilet - done.
Second is to build what is called a diaphragm wall by the fence. I excavated a trench 100mm x 1400mm below the fence and filled it full of concrete and reo N12 @ 350mm . Being mostly sand, it was easy for the first metre. Then it was hard sandy clay. The idea behind a diaphragm wall is to enable "bulk excavation" without impacting the park. This wall is approximately half the final width of the wall.
Friday, October 14, 2011
Bird Attack
Wednesday, October 5, 2011
Camper in the Wild
The camper was never really designed for wet weather. On the first night it rained and rained and the canvas got wet and kind of started wetting ur
bed clothes. Fortunately we packed a plastic tarp. The combination led to a dry night sleep. It also doubles as a bit of insulation for when it is
cold. In short, all is good.
It looks a bit cramped to sleep in, but it is not. There is a good amount of head room and a window towards the front - which is sheltered by the
rain by the tarp. On the tray proper are are tiled rubber mats perfect for muddy environments.
We are at Green Valley - a manual amusement park in the middle of nowhere off a dirt track. It is great. The roller coaster makes an absolute acket
and you have to push it yourself all the way to the top before you jump on and go for a ride. I have got to take some photos.
bed clothes. Fortunately we packed a plastic tarp. The combination led to a dry night sleep. It also doubles as a bit of insulation for when it is
cold. In short, all is good.
It looks a bit cramped to sleep in, but it is not. There is a good amount of head room and a window towards the front - which is sheltered by the
rain by the tarp. On the tray proper are are tiled rubber mats perfect for muddy environments.
We are at Green Valley - a manual amusement park in the middle of nowhere off a dirt track. It is great. The roller coaster makes an absolute acket
and you have to push it yourself all the way to the top before you jump on and go for a ride. I have got to take some photos.
Friday, September 30, 2011
Home Automation
Wednesday, September 28, 2011
camper van
Sunday, September 18, 2011
Ute Camper - Squaring Up
Sunday, September 11, 2011
Camper
Friday, August 26, 2011
Corbels Again
My DIY concrete vibrator seemed to work well - see previous post. As bonus, the corbels make good chin up bars ;) Nice and chunky - suits the garage.
Here is my very dodgy form work... I wet downed the concrete blocks before placing the concrete - it makes it stick better. The concrete was a fairly dry mix. It is amazing that the mix can go dry to wet in just a cup of water.

Here is my very dodgy form work... I wet downed the concrete blocks before placing the concrete - it makes it stick better. The concrete was a fairly dry mix. It is amazing that the mix can go dry to wet in just a cup of water.

I accidently covered some of the screws with the chip board and had to do some cutting. Not for the faint hearted is an angle grider with a multi cutting blade...
Off comes the form work and now appears the green concrete. I used a wire brush to create a bit of texture...
Tuesday, August 23, 2011
Baked Cheese Cake
Base:
1 cup of Arnotts Scotch Finger or Nice biscuits
6 table spoons of melted butter
3 table spoons of sugar
Filling:
375g of cream cheese (softened)
2 eggs
1/2 cup (100g) sugar
1 table spoon of vanilla essence
1 cup of light sour cream
Bake at low temp for ~ 35 minutes.
1 cup of Arnotts Scotch Finger or Nice biscuits
6 table spoons of melted butter
3 table spoons of sugar
Filling:
375g of cream cheese (softened)
2 eggs
1/2 cup (100g) sugar
1 table spoon of vanilla essence
1 cup of light sour cream
Bake at low temp for ~ 35 minutes.
Sunday, August 21, 2011
Pork and Peanuts
3/4 pound of cubed pork
2 tablespoons of oil
1.5 table spoons of soya sauce
1.5 table spoons of brown sugar
3 oz of unsalted peanuts
2 carrots
1 small onion
2 green peppers
Fry up the sauces and oil in the wok as a reduction. The idea is that this will coat the meat and veggies.
Kids should love it.
2 tablespoons of oil
1.5 table spoons of soya sauce
1.5 table spoons of brown sugar
3 oz of unsalted peanuts
2 carrots
1 small onion
2 green peppers
Fry up the sauces and oil in the wok as a reduction. The idea is that this will coat the meat and veggies.
Kids should love it.
Monday, August 15, 2011
Sunday, August 14, 2011
Concrete Corbel
I placed the concrete. Big, chunky and texture matches the wall...
I welded up some steel brackets for some shelves. The advantage is that they are perfectly level and each shelf has a theoretical working design load of 600kg per shelf (if you trust my welding). Anyway each bracket can support my weight on the tip.
I welded up some steel brackets for some shelves. The advantage is that they are perfectly level and each shelf has a theoretical working design load of 600kg per shelf (if you trust my welding). Anyway each bracket can support my weight on the tip.
Sunday, August 7, 2011
Corbels for the Garage
Bent the steel with my reo-bender (that I bought for the steel re-inforcing for the house) and araldited them in using Sika anchor fix. I should have heated up the stuff in my heating cabinet to make it flow easier. The welding was just to hold the steel in place.
I used WD-40 to get the coach screws all the way in. Together with an impact driver, they made it all the way in - 200mm !
I put some (temporary) brackets in to support the concrete form. I used packers to level it up - :). I estimate it will need to support the setting of around 100kg of concrete. BTW, have no fear. The wall is a solid re-inforced concrete filled wall. One N16 rod mesh at 400mm squares.
I used WD-40 to get the coach screws all the way in. Together with an impact driver, they made it all the way in - 200mm !
I put some (temporary) brackets in to support the concrete form. I used packers to level it up - :). I estimate it will need to support the setting of around 100kg of concrete. BTW, have no fear. The wall is a solid re-inforced concrete filled wall. One N16 rod mesh at 400mm squares.
Saturday, August 6, 2011
Steel Supports
Lots of drilling today - 60 13mm holes in steel and 64 masonary holes. I'm getting ready to araldite steel reinforcementg into the wall. This particular one is 50mm closer to the posts than the others - hence the washers. I only have an auger bit that can drill 150mm and a box of 200mm coach screws.
Sunday, July 31, 2011
Steel Supports
As part of the garage renovation, I wanted to reinforce the bearers and posts. I bought some 8mm thick angle steel, some bolts and some coach screws.
Drilling into the steel (13mm holes) was a lot easier than I expected. Especially with one of those cheap 1/2 horse power drill presses from kmart. Admittedly 2hp would have been better. I drilled a 4mm pilot hole and then the 13mm. I kept lubricating with wd40 to keep it cool. It took around 1 minute to drill. I set the drill to its lowest speed. The steel came off in nice little sharp spirals.

Here is the end result (kind of). Coach screws to go in, steel to be painted and of course so is the concrete. The holes down the bottom are for rebar.
Drilling into the steel (13mm holes) was a lot easier than I expected. Especially with one of those cheap 1/2 horse power drill presses from kmart. Admittedly 2hp would have been better. I drilled a 4mm pilot hole and then the 13mm. I kept lubricating with wd40 to keep it cool. It took around 1 minute to drill. I set the drill to its lowest speed. The steel came off in nice little sharp spirals.

Here is the end result (kind of). Coach screws to go in, steel to be painted and of course so is the concrete. The holes down the bottom are for rebar.
Sunday, July 24, 2011
Giant Radishes and Compost
One of the giant raddishes removed to prepare the garden bed. Past their eat by date.

About 6 months worth of compost going into the vege patch. Really smells. Wheely bins are great for composting. The holes in the bin clogged up, so I enlarged them to 8mm.

I visited Edcon Steel for some angle iron. Their customer service was spot one, amazing, helpful and well priced. I can't wait to purchase more steel.

About 6 months worth of compost going into the vege patch. Really smells. Wheely bins are great for composting. The holes in the bin clogged up, so I enlarged them to 8mm.