Thursday, June 4, 2009

Pier Forms and Plumbing

Yesterday and today, I got stuck into completing the pier forms and getting some plumbing done.

I arranged for a plumber to remove the boundary trap and plumbing that would exist in the foundation. He just pretty much cut the sewer at the boundary and put in a 90 degree angle to shoot the drain vertically and re-connect my toilet. I also got him to move the water meter further towards the letter box - now it is right out of the way :)

The plumbing inpector will need to look at the plumber's handy work so I shored it up to keep the sand out.



My pier form work is almost finished. You can see the post stirrup being held in place using some timber. I routed out a slot in the top timber for the post to sit in.