The outside post holders are looking good. There is a slight dome to allow water to drain...
The internal post holders are doubled up to support the enormous weight of a post.
You can see the shoring is beginning to fail...
The depths of the different holes of the 300mm stump are as follows:
F0 2m, H0 1.91m, M0 1.73m, M1 2.15m, N1 1.75m, M3 1.92m, N3 1.69m, M4 1.71m. Theses heights are all around 0.2m below ground.
The depths from the bottom of the foundation's trench of the Sydney Pier holes are as follows: 1.7m, 1.5m, 1.4m, 1.1m, 1.2m, 1m, 0.9m, 0.7m, 0.5m.
The depths from 0.2m below the FFL of the garage of the centre holes are: D3 1.03m, D1 1M, F3 1.14M, F1 1.05m, H3 1.21m, H1, 1.14m, J3 1.03m, J1 1.12m.
All holes were drilled into the solid clay level as specified by the geo techincal report.