I went to the work site early this morning to clean the concrete off the post holders and to wet the concrete to aid curing.
The outside post holders are looking good. There is a slight dome to allow water to drain...
The internal post holders are doubled up to support the enormous weight of a post.
You can see the shoring is beginning to fail...
The depths of the different holes of the 300mm stump are as follows:
F0 2m, H0 1.91m, M0 1.73m, M1 2.15m, N1 1.75m, M3 1.92m, N3 1.69m, M4 1.71m. Theses heights are all around 0.2m below ground.
The depths from the bottom of the foundation's trench of the Sydney Pier holes are as follows: 1.7m, 1.5m, 1.4m, 1.1m, 1.2m, 1m, 0.9m, 0.7m, 0.5m.
The depths from 0.2m below the FFL of the garage of the centre holes are: D3 1.03m, D1 1M, F3 1.14M, F1 1.05m, H3 1.21m, H1, 1.14m, J3 1.03m, J1 1.12m.
All holes were drilled into the solid clay level as specified by the geo techincal report.