Today I went on a road trip to Prospect (to collect 6 plain faced blocks) and Campbelltown to collect the drains. It took ages. I left around 6am and didn't get back till 11am.
I went to Freshwater in the afternoon to finish off the coats of water proofing. It is official there are now three coats applied with most of a 20L pale left.
Here is a picture of the blocks removed.
Here is the narrow gap that I get down to apply the water proofing. I'm guessing it is between 150 and 200mm wide.